Campbell County Resources

Please find below links to the video presentation delivered by Mike Regan and Frank Twomey to the Culpeper Board of Supervisors on June 2, 2026, together with the supporting letters available for download.

 

The presentations were prepared to inform Board members of the PJM grid operator’s processes for project selection and modification, with particular focus on the history of revisions to the proposed Culpeper Yeat substation. Mr. Regan demonstrates that the Yeat substation is designed to function as a bulk energy distribution hub in the regional grid. Mr. Twomey’s presentation outlines the foreseeable consequences for the county if it is designated a bulk electric power distribution hub upon approval of the Yeat substation.

 

A draft letter to the PJM Board is also included. That Board will vote in early July on whether to approve the changes to the Valley Link transmission line and substation plan.  As we stated in the letter to you, we urge you to adopt and transmit to PJM Interconnection the substance of the draft letter now being sent by Culpeper County, stating unequivocally that Campbell County will not approve the Joshua Falls substation as proposed.

 

Our open letter to the Campbell Board of Supervisors, which was transmitted previously, is reproduced below for your immediate reference.

Resources

Campbell County in the Spotlight

image (35).jpg

Click above to read a previous post regarding Campbell county's newly planned "super" substation.

Open Letter to Campbell 

Screenshot 2026-06-03 at 3.00.32 PM.png

A copy of the open letter sent to Campbell County Supervisors urging them to reject the substation.  Clicking on the image will download the PDF document.

Video of Presentation to Culpeper BOS on 6-2-26

Click above to watch the YouTube video of the two presentations to the Culpeper BOS as well as the Q&A and subsequent unanimous vote to send the letter.

Draft Letter to PJM Grid Operator

Screenshot 2026-06-03 at 3.00.10 PM.png

Adopt and transmit to PJM Interconnection the substance of the draft letter now being sent by Culpeper County, stating unequivocally that Campbell County will not approve the Joshua Falls substation as proposed. Clicking on the image will download the PDF document.